Masoneilan SVI FF Instruction Manual
=
|
77
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
Check the Electronic Module Connections
The SVI FF terminal board has terminal blocks with screw connectors. Not all options are
available for every model. Confirm the correctness of all applicable connections to the
electronics module.
Operational Checkout
The operational checkout of the SVI FF consists of:
1. “Connect to the H1 Network”
2. “Power Up the SVI FF” on page 78
Connect to the H1 Network
Connect to the Fieldbus power supply, then check and configure with the local display and
pushbuttons, if so equipped. Refer to “Pushbuttons and Local Display” on page 128 for further
details.
If the SVI FF is not equipped with local display use ValVue and a PC with an FF setup or a
handheld communicator.
Do not remove the instrument cover or connect to an electrical
circuit in a Hazardous Area unless power is disconnected.
When an SVI FF is turned on, apply the air supply before applying
the electrical input signal.
When an SVI FF is turned on, apply the air supply before applying
the electrical power.
WARNING
NOTE
NOTE
Summary of Contents for Baker Hughes Masoneilan SVI FF
Page 12: ...This page intentionally left blank ...
Page 72: ...This page intentionally left blank ...
Page 82: ...This page intentionally left blank ...
Page 94: ...This page intentionally left blank ...
Page 108: ...This page intentionally left blank ...
Page 198: ...This page intentionally left blank ...
Page 206: ...This page intentionally left blank ...
Page 224: ...This page intentionally left blank ...
Page 228: ...This page intentionally left blank ...
Page 230: ...This page intentionally left blank ...
Page 250: ...This page intentionally left blank ...
Page 262: ...This page intentionally left blank ...
Page 263: ......