background image

CP Converter Shelf - Quick Start Guide 

Document 850033106   r04   2015 April 

Specifications and Application 



Specifications and ordering information are in the Compact Power Line (CPL) Brochure available at 

www.gecriticalpower.com

 



Equipment and subassembly ports: 1. are suitable for connection to intra-building or unexposed wiring or cabling; 

 

2. can be connected to shielded intra-building cabling grounded at both ends. 



Grounding / Bonding Network – Connect to an Isolated Ground Plane (Isolated Bonding Network) or an Integrated Ground Plane (Mesh-

Bonding Network or Common Bonding Network). 



Installation Environment - Install in Network Telecommunication Facilities, OSP, or where NEC applies. 



DC return may be either Isolated DC return (DC-I) or Common DC return (DC-C). 

 

Reference Documents 

These documents are available at 

www.gecriticalpower.com

Document Title 

850035894 

Galaxy Pulsar Edge Quick Start Guide 

CC848836981 

Galaxy Pulsar Edge Controller Family Product Manual 

 

Compact Power Line (CPL) Brochure 

GE  

 601 Shiloh Rd. 

 Plano, TX 75074 

 1- 888-546-3243 

www.gecriticalpower.com 

Summary of Contents for CP2000DC54PEZ

Page 1: ...sition mounting ears as required 8 screws each Torque to 25 in lb 2 8Nm Phillips screwdriver 2 Attach shelf to the frame using a minimum of four screws two on each side 12 24 provided Torque to 35 in lb 4Nm 5 16 socket Chassis Ground Output Return Ground 48V Output DC Inputs Converter Inputs POS NEG NEG POS 1 2 4 3 Step 3 Connect 48V Output and Output Return Lugs 1 4 on 5 8 centers not provided To...

Page 2: ...ery Temp and Voltage Monitor to J3 Step 8 Install 1 Wire Battery Temp and Voltage Monitor per Galaxy Pulsar Edge Controller Quick Start Guide Optional Step 9 Install Converter s Latch 1 Slide converter into its slot approximately 3 4 of the way 2 Open the faceplate by sliding the faceplate latch to the left until the faceplate releases and swings outward 3 Slide the unit into the slot until it eng...

Page 3: ... Alrm 4 J2 All Controllers Controller Information Alarm Connections See the Compact Power Line Brochure for details Alarm connections are on the rear of the shelf J1 is Alarm Outputs and J2 is Alarm Inputs Change alarm descriptions via LAN port Web pages or Craft port EasyView2 when required J1 1 Includes a mixture of Alarm Inputs and or Alarm Outputs de pending on the controller model 2 Connector...

Page 4: ...ng Network Connect to an Isolated Ground Plane Isolated Bonding Network or an Integrated Ground Plane Mesh Bonding Network or Common Bonding Network Installation Environment Install in Network Telecommunication Facilities OSP or where NEC applies DC return may be either Isolated DC return DC I or Common DC return DC C Reference Documents These documents are available at www gecriticalpower com Doc...

Reviews: