5
b) VOLTAGE BANKS
PATH: SETTINGS
SYSTEM SETUP
AC INPUTS
VOLTAGE BANK F5
One bank of phase/auxiliary VTs can be set, where voltage banks are denoted in the following format (
X
represents the
module slot position letter):
Xa
, where
X
= {
F
} and
a
= {
5
}.
See the
Introduction to AC sources
section at the beginning of this chapter for additional details.
With VTs installed, the relay can perform voltage measurements as well as power calculations. Enter the
PHASE VT F5 CON-
NECTION
made to the system as “Wye” or “Delta”. An open-delta source VT connection would be entered as “Delta”.
The nominal
PHASE VT F5 SECONDARY
voltage setting is the voltage across the relay input terminals when nominal
voltage is applied to the VT primary.
For example, on a system with a 13.8 kV nominal primary voltage and with a 14400:120 volt VT in a delta connec-
tion, the secondary voltage would be 115; that is, (13800 / 14400) × 120. For a wye connection, the voltage value
entered must be the phase to neutral voltage which would be 115
/
= 66.4.
On a 14.4 kV system with a delta connection and a VT primary to secondary turns ratio of 14400:120, the voltage
value entered would be 120; that is, 14400 / 120.
5.4.2 POWER SYSTEM
PATH: SETTINGS
SYSTEM SETUP
POWER SYSTEM
The power system
NOMINAL FREQUENCY
value is used as a default to set the digital sampling rate if the system frequency
cannot be measured from available signals. This may happen if the signals are not present or are heavily distorted. Before
reverting to the nominal frequency, the frequency tracking algorithm holds the last valid frequency measurement for a safe
period of time while waiting for the signals to reappear or for the distortions to decay.
The phase sequence of the power system is required to properly calculate sequence components and power parameters.
The
PHASE ROTATION
setting matches the power system phase sequence. Note that this setting informs the relay of the
actual system phase sequence, either ABC or ACB. CT and VT inputs on the relay, labeled as A, B, and C, must be con-
nected to system phases A, B, and C for correct operation.
VOLTAGE BANK F5
PHASE VT F5
CONNECTION: Wye
Range: Wye, Delta
MESSAGE
PHASE VT F5
SECONDARY: 66.4 V
Range: 25.0 to 240.0 V in steps of 0.1
MESSAGE
PHASE VT F5
RATIO: 1.00 :1
Range: 1.00 to 24000.00 in steps of 0.01
MESSAGE
AUXILIARY VT F5
CONNECTION: Vag
Range: Vn, Vag, Vbg, Vcg, Vab, Vbc, Vca
MESSAGE
AUXILIARY VT F5
SECONDARY: 66.4 V
Range: 25.0 to 240.0 V in steps of 0.1
MESSAGE
AUXILIARY VT F5
RATIO: 1.00 :1
Range: 1.00 to 24000.00 in steps of 0.01
POWER SYSTEM
NOMINAL FREQUENCY:
60 Hz
Range: 25 to 60 Hz in steps of 1
MESSAGE
PHASE ROTATION:
ABC
Range: ABC, ACB
MESSAGE
FREQUENCY AND PHASE
REFERENCE: SRC 1
Range: SRC 1, SRC 2
MESSAGE
FREQUENCY TRACKING:
Enabled
Range: Disabled, Enabled
NOTE
3
Summary of Contents for D30D00HCHF8AH6AM6BP8BX7A
Page 10: ...x D30 Line Distance Protection System GE Multilin TABLE OF CONTENTS...
Page 374: ...5 248 D30 Line Distance Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5...
Page 398: ...6 24 D30 Line Distance Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6...
Page 410: ...7 12 D30 Line Distance Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7...
Page 444: ...9 24 D30 Line Distance Protection System GE Multilin 9 5 FAULT LOCATOR 9 THEORY OF OPERATION 9...
Page 576: ...B 102 D30 Line Distance Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B...
Page 616: ...D 10 D30 Line Distance Protection System GE Multilin D 1 IEC 60870 5 104 PROTOCOL APPENDIX D D...
Page 628: ...E 12 D30 Line Distance Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E...
Page 636: ...F 8 D30 Line Distance Protection System GE Multilin F 3 WARRANTY APPENDIX F F...
Page 646: ...x D30 Line Distance Protection System GE Multilin INDEX...