504
D90
PLUS
LINE DISTANCE PROTECTION SYSTEM – INSTRUCTION MANUAL
EQUIPMENT MANAGER FLEXANALOG™ PARAMETERS
CHAPTER 9: EQUIPMENT MANAGER
BAT MON HIGH VDC OP ..........................Asserted when the battery high DC voltage monitor operates.
BAT MON HIGH VDC PKP........................Asserted when the battery high DC voltage monitor picks up.
BAT MON LOW VDC DPO........................Asserted when the battery low DC voltage monitor drops out.
BAT MON LOW VDC OP ...........................Asserted when the battery low DC voltage monitor operates.
BAT MON LOW VDC PKP.........................Asserted when the battery low DC voltage monitor picks up.
Breaker arcing current operands
BKR ARC 1 DPO...........................................Asserted when breaker arcing 1 element drops out.
BKR ARC 1 MAX IN DPO ..........................Asserted when the maximum symmetrical interruption of the
breaker arcing 1 element drops out.
BKR ARC 1 MAX IN OP..............................Asserted when the maximum symmetrical interruption of the
breaker arcing 1 element operates.
BKR ARC 1 OP..............................................Asserted when breaker arcing 1 element operates.
BKR ARC 2...
..................................................The operands listed above are available for the breaker arcing
2 element.
Equipment manager FlexAnalog™ parameters
The following equipment manager FlexAnalog™ parameters (analog operands) are
available for the D90
Plus
. They are listed alphabetically by operand syntax The definitions
listed below reflect the programmed source and element names, where applicable.
Battery monitor analog operand
Battery Voltage...........................................Metered battery voltage for the battery monitoring feature
Breaker arcing analog operands
Bkr 1 Arc Amp A..........................................Metered phase A arcing current for breaker 1
Bkr 1 Arc Amp B..........................................Metered phase B arcing current for breaker 1
Bkr 1 Arc Amp C..........................................Metered phase C arcing current for breaker 1
Bkr 1 Op Time A..........................................Metered phase A operating time for breaker 1
Bkr 1 Op Time B..........................................Metered phase B operating time for breaker 1
Bkr 1 Op Time C..........................................Metered phase C operating time for breaker 1
Bkr 1 Op Time..............................................Metered three-phase operating time for breaker 1
Bkr 2 Arc Amp A..........................................Metered phase A arcing current for breaker 2
Bkr 2 Arc Amp B..........................................Metered phase B arcing current for breaker 2
Bkr 2 Arc Amp C..........................................Metered phase C arcing current for breaker 2
Bkr 2 Op Time A..........................................Metered phase A operating time for breaker 2
Bkr 2 Op Time B..........................................Metered phase B operating time for breaker 2
Bkr 2 Op Time C..........................................Metered phase C operating time for breaker 2
Bkr 2 Op Time..............................................Metered three-phase operating time for breaker 2