7 Troubleshooting
M1046983 04/08
7-17
Test 3
Testing the airway pressure transducer, and Port 1 and Port 3 u-cup seals
1. Access the Gas Delivery Schematic (Section 12.3.2) of the Service Application.
2. Set O
2
Flow to
0.1 l/min
.
3. Attach the Machine Test Tool to the breathing system interface ports (using the
alignment post) as shown above.
4. Occlude the tapered plug.
• the Airway Pressure reading should increase.
• If not, there is a leak in the tested circuit.
5. Set O
2
Flow to 0.00 l/min.
Alignment
Post
Summary of Contents for Datex-Ohmeda Aisys Carestation
Page 1: ...Aisys Anesthesia Machine Technical Reference Manual ...
Page 16: ...Notes xiv 04 08 M1046983 ...
Page 32: ...Notes 1 16 04 08 M1046983 ...
Page 158: ...Notes 5 20 04 08 M1046983 ...
Page 288: ...Notes 7 106 04 08 M1046983 ...
Page 325: ...9 Repair Procedures M1046983 04 08 9 29 The rear inverter A B C ...
Page 356: ...Notes 9 60 04 08 M1046983 ...
Page 401: ...10 Illustrated Parts M1046983 04 08 10 45 14 1 2 3 6 5 4 5 8 7 15 16 18 17 10 9 11 12 13 or ...
Page 452: ...Notes 10 96 04 08 M1046983 ...
Page 466: ...11 14 04 08 M1046983 Notes ...
Page 470: ...Aisys 12 4 04 08 M1046983 12 3 System Schematics 12 3 1 Power Schematic ...
Page 478: ...Aisys 12 12 04 08 M1046983 12 6 3 Tools Transfer Logs ...
Page 497: ......