GE Zenith Controls, Inc. 

 

 830 West 40th Street Chicago, IL 60609  / Telephone: (800) 637-1738 

 

 

 

 

 

rev 9-5-2012 

GE Digital Energy 
Power Quality 

 

 
 
 

 

NA 

Verify that IMPORTANT SAFETY INSTRUCTIONS (Section 1) have been 
reviewed. 

 

 

 

Verify that the UPS is carefully unpackaged, inspected for damage, and 
placed near the installation location. 

 

 

 

Verify the proper size wires and circuit breakers are utilized. 

 

 

 

Verify the proper input voltage installation procedures for 208-240vAC or 
120vAC input are used to connect the UPS. 

a.  4.4.1.1 Standard installation procedure: Vin 208-240Vac, 

Vout 120/208/220/230/240Vac 

b.  4.4.1.2 Installation procedure: Vin 120Vac (optional 

5/6kVA), Vout 120/208/220/230/240Vac 

Proper input voltage is connected to include the system ground 

 

 

 

Referring to the following sections of the installation / user manual, 
perform the hardware modifications required for the input voltage to be 
applied. 

1.  4.4.2 Available input voltages: hardware modifications 
2.  4.4.2.1 Input voltage 208 or 240Vac 
3.  4.4.2.2 Input voltage 120Vac (optional, 5/6kVA only) 

 

 

 

 

Referring to the following sections of the installation / user manual, 
perform the hardware modifications required for the output voltage 
necessary for the critical load. 

1.  4.4.3 Available output voltages: hardware modifications 
2.  4.4.3.1 Output voltage 208Vac 
3.  4.4.3.2 Output voltage 120Vac split-phase 
4.  4.4.3.3 Output voltage 220/230/240Vac 
5.  4.4.3.4 Output voltage 120Vac single phase 

 

 

 

 

Referring to the following section of the installation / user manual, perform 
the software modifications required for the input and output voltage 
associated to any hardware modifications performed above. 

4.4.4 Input / output voltages: Software modification 

 

 

 

 

Referring to the following section of the installation / user manual, perform 
the installation of the external battery pack(s). 
4.4.5 Installation of GE Digital Energy LanPro-U battery extension pack(s) 

 

 

 

Referring to the section 4.4.6 LanPro-11U series: 2 / 3 / 4 parallel 
operating units – additional info, contact GE Power Quality service with 
any questions on the installation of a parallel system. 

 

 

 

Referring to the section 5 of the installation / user manual, verify proper 
operation of the GE LP11-U UPS. 

 

 

 

 
If you have any questions or need to request onsite service, please contact us at 800-637-1738 
(Option 3). 

 

Thank you for your business. 