Digital Energy™
g
OPM_LPS_3UI_10K_20K_0US_V010.doc
38/38
Installation Guide
LP 33
/ 10 - 20 kVA
5 NOTES
5.1 NOTES
FORM
It is recommended to note in this section
Notes
, with date and short description all the operations
performed on the UPS, as: maintenance, components replacement, abnormal situations, etc. .
Date
Description
Done by