g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc
51/88
Operating
Manual
SG Series
10, 20, 30 & 40 kVA
7.2.3 Restore to normal operation after “
total off”
View of the panel after pressing the
button “
total off”
.
•
All
Contacts
are open;
•
Rectifier
,
Inverter
and
Static-Switch
shutdown.
1. Reset
“
total off
”
by pressing and
holding the “
total off
”
button and the
“
inverter on
”
( I )
key simultaneously
until the
Rectifier
starts.
2. Connect the Battery to the UPS by closing the Battery Switch or Fuses, in case
of External Battery
.
3. Press
“
inverter on
”
( I ) key
.
•
Soft-start of
Inverter
indicated with
blinking
LED
.
•
At the end of Soft-start the
LED
remains lit.
•
UPS output
LED
indicates
Load on
Inverter
.
The
LCD
must display on the main screen the status
“
LOAD ON INVERTER
”
.
End of procedure