Operatine Manual
SitePro 60 kVA
This symbol refers to the operations of a parallel system.
These steps are not applicable for single units.
8.2 SHUT DOWN PROCEDURES
Different procedures can be followed to turn Off the UPS parallel system:
•
Complete Shut Down SitePro single and parallel UPS system.
The UPS system and the critical load have to be completely powered down.
•
Maintenance Shut Down SitePro single and parallel UPS system.
The UPS system has to be turned OFF, while providing the load power by mains through
the maintenance bypass switches
Q2
.
•
Shut down of a single unit SitePro in a parallel system.
One unit of the redundant parallel system has to be turned OFF, while the load is shared
between the other units of the parallel system.