OPM_STS_400_25A_100_1GB_V011
44
GE DE STS: installation and operating manual 1.1 (GB)
Digital Energy
™
Static Transfer Switch
g
Operational parameter
Preferred source selection
PRIMARY SOURCE
or
SECONDARY SOURCE
With retransfer or without
retransfer after disturbance
disappearing
Remote preferred source
selection
PRIMARY SOURCE
or
SECONDARY SOURCE
Remote relay selection for
preferred source
Overvoltage level setting
+6%
+9%
+13%
+16%
+20%
Transfer is performed when
voltage value crosses the level.
Programmed by DIP switch
selection
Undervoltage level setting
-8%
-12%
-16%
-16%
-24%
Transfer is performed when
voltage value crosses the level.
Programmed by DIP switch
selection
Phase delay limit for
synchronized sources
±
8°
±
12°
±
16°
±
20°
±
24°
Programmed by DIP switch
selection
Transfer blocked after output
current limit exceeding
3 In
4.5 In
6 In
7.5 In
9 In
Transfer without overcurrent blockade
Programmed by DIP switch
selection
Transfer delay after manual
triggering with both sources
synchronized
<0,1ms
Transfer delay in automatic
mode with both sources
synchronized
<6ms
Transfer delay in manual or
automatic mode without
synchronization
13ms
17ms
25ms
50ms
Programmed by DIP switch
selection
Retransfer to preferred source
delay with both sources
operational
0.8 s
1s
8s
25s
Programmed by DIP switch
selection