Operation
3-1
March 2008
Introduction
See Chapter 1,
Installation
, and Chapter 2,
Initial Setup
, to prepare
the system for operation. When the meter is ready to take
measurements, proceed with this chapter. The following specific
topics are discussed:
•
Powering Up
•
Using the Display
•
Taking Measurements
Note:
All inputs and outputs of the Model GS868 are calibrated at
the factory, prior to shipment. If it becomes necessary to
recalibrate any of the inputs and/or outputs, see Chapter 1,
Calibration
, of the
Service Manual
.
!WARNING!
To ensure the safe operation of the Model GS868, it must be
installed and operated as described in this manual. In
addition, be sure to follow all applicable local safety codes
and regulations for the installation of electrical equipment.
Summary of Contents for DigitalFlow GS868
Page 6: ...Chapter 1...
Page 28: ...Chapter 2...
Page 40: ...Chapter 3...
Page 41: ...Operation Introduction 3 1 Powering Up 3 2 Using the Display 3 3 Taking Measurements 3 5...
Page 49: ...Chapter 4...
Page 50: ...Specifications General 4 1 Electrical 4 2 Operational 4 4 Transducer 4 4 Flowcell 4 5...
Page 56: ...Appendix A...
Page 57: ...CE Mark Compliance Introduction A 1 Wiring A 1 External Grounding A 1...
Page 59: ...Appendix B...
Page 60: ...Data Records Option Cards Installed B 1 Initial Setup Data B 2...
Page 64: ...Appendix C...
Page 71: ...Appendix D...
Page 72: ...Measuring P and L Dimensions Introduction D 1 Measuring P and L D 1...