March 2008
3-2
Operation
Powering Up
Because the Model GS868 does not have an ON/OFF switch, it will
power up as soon as the connected power source is energized.
Note:
For compliance with the European Union’s Low Voltage
Directive (73/23/EEC), this unit requires an external power
disconnect device such as a switch or circuit breaker. The
disconnect device must be marked as such, clearly visible,
directly accessible, and located within 1.8 m (6 ft) of the
Model GS868.
Immediately upon power up, the Model GS868 displays the GE logo
and the software version in the left pane of the display window. The
Model GS868 performs a series of internal checks and display the
results in the right pane of the display window.
Note:
If the Model GS868 fails any of the internal checks, try
disconnecting the power and then re-powering the unit. If the
Model GS868 continues to fail any of the internal checks,
contact the factory for assistance.
After successfully performing the internal checks, the Model GS868
begins taking measurements. The power up display is replaced by a
measurement mode display similar to that shown in Figure 3-1 below.
Note:
As a minimum, the system and pipe parameters (for each
installed channel of a 2-channel meter) must be entered before
the Model GS868 can display valid data. Refer to Chapter 2,
Initial Setup
, for specific instructions.
Figure 3-1: A Typical Measurement Display
Proceed to the next section for a description of the components of the
Model GS868 display screen.
Velocity
Volumetric
m/s
SCM/M
6.95
1038.7
SITE1 PIPE1
SITE1 PIPE1
VEL
VOLUM
-TOTL
+TOTL
Summary of Contents for DigitalFlow GS868
Page 6: ...Chapter 1...
Page 28: ...Chapter 2...
Page 40: ...Chapter 3...
Page 41: ...Operation Introduction 3 1 Powering Up 3 2 Using the Display 3 3 Taking Measurements 3 5...
Page 49: ...Chapter 4...
Page 50: ...Specifications General 4 1 Electrical 4 2 Operational 4 4 Transducer 4 4 Flowcell 4 5...
Page 56: ...Appendix A...
Page 57: ...CE Mark Compliance Introduction A 1 Wiring A 1 External Grounding A 1...
Page 59: ...Appendix B...
Page 60: ...Data Records Option Cards Installed B 1 Initial Setup Data B 2...
Page 64: ...Appendix C...
Page 71: ...Appendix D...
Page 72: ...Measuring P and L Dimensions Introduction D 1 Measuring P and L D 1...