LIST OF FIGURES
Page
Figure
Description
2.1
Flow Control Center
6
2.2
Closed Loop Membrane Element Cleaning
11
2.3
Membrane Element Installation
13
2.4
Membrane Element Direction for Installation
14
LIST OF TABLES
Table
Description
2.1
E2/EZ2-Series Machine Piping Connections
1
2.2
E2/EZ2-Series Feed Water Requirements
2
2.3
E2/EZ2-Series Primary Pressure Range
5
2.4
Flow Specifications for E2/EZ2-Series Machines
7
2.5
Permeate Back Pressure Correction Factors
8
NOTE:
This manual, along with all GE Infrastructure manuals, is available at
www.ge.water.com.
Summary of Contents for E2 Series
Page 18: ...Figure 2 4 Membrane Element Direction for Installation 14 ...
Page 24: ......