4.7.6 Maintenance and checkout procedures
These procedures should be performed
every year
. A visual inspection, functional check-
out and safety analysis test has to be done. For the visual inspection follow paragraph
3.1. The functional checkout is done by proceeding a data transfer.
Note, the Quick Link has no electrical ground connection, so, the Safety Analysis Test
has to be performed by proceeding the Enclosure Leakage Current Test.
This test is performed to measure leakage current from chassis and exposed metal parts
to ground during normal conditions (N. C.) and single fault conditions (S.F.C.).
In any case, the leakage current has to be measured from front-and backpanel and the
metal shield of the Twisted Pair connector to ground.
Connect the unit under test to your Safety Tester.
With Quick Link, the position of the ground switch GND does not matter.
- During normal conditions (N.C.), referring to the electrical diagram, measurements
have to be done under the following conditions:
* Polarity switch
NORM and RVS
* S 1
closed
- During single fault conditions (S.F.C.), referring to the electrical diagram, the measure-
ments have to be done under the following conditions:
* Polarity switch
NORM and RVS
* S 1
open
Test has failed if the measured values are greater than:
N.C.
S.F.C.
100
µ
A500
µ
A
300
µ
A (U.S. requirements)
UNIT
UNDER
TEST
POWER CORD
Probe to exposed chassis
[M]
POWER CORD
Safety Tester
HIGH
LOW
GND
GND
NORM/RVS
S1
Summary of Contents for Eagle 1000
Page 1: ...Eagle 1000 Patient Monitor Servicing Instructions 227 468 01 SA e Revision G ...
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 130: ......
Page 135: ......
Page 136: ......
Page 138: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......