Modifications reserved
Page 81/90
GE_UPS_USM_TLE_SUL_40K_M15_1US_V010.docx
User Manual
TLE Scalable Series 40 - 150 UL S1
NOTE !
Ensure the
LED 1 (Rectifier)
is lit before carrying out this procedure.
It indicates that the
DC-link 1
and
DC-link 2
has reached 400Vdc
(see screen
MEASURES
/ Rectifier)
!
Before performing the next procedure (4) make sure that the LED 3
(Booster/Battery charger)
is lit.
3. Connect the Battery on the Unit to reconnect by closing the
“
Battery Cabinet Breaker
”
(Pos. I).
Synoptic diagram of the unit to reconnect
Synoptic diagram of other units
4. Insert the Inverter performing the command "Inverter ON” on the Unit to reconnect
.
Perform the
“Inverter ON”
command from the screen:
Commands 1 / Inverter /
ON
.
•
After
Soft-start
of the
Inverter
, the
Inverter
connects automatically to the
other Units
of the
Parallel
System
.
•
LED ALARM
turns Off and the
LED LOAD PROTECTED
must be lit.
The
Synoptic Diagram
, on all UPS units, must display the status
“
LOAD SUPPLIED BY INVERTER
”
.
Synoptic diagram of the unit to reconnect
Synoptic diagram of other units
END OF PROCEDURE