Critical Power
Modifications reserved
Page 20/53
GE_UPS_ISG_TLE_SUL_40K_M15_1US_V010.docx
Installation Guide
TLE Scalable Series 40 - 150 UL S1
4.6
UNPACKING
Move the equipment in it’s original packing, wooden case, until the place of installation and remove the
packing and the transport sockets only just before installing the UPS.
Be aware of the heavy weight of the UPS, pay attention when moving the UPS cabinet.
White color
=
without any anomaly
Red color
=
anomaly evidence
The package of the
TLE Scalable Series 40 - 150
is equipped with
ShockWatch
(indicator for
shock), and
TiltWatch
(indicator for overthrow)
on the outside.
These devices indicate an eventual shock or
overthrow during transport.
Whenever these devices show a possible
anomaly, the UPS shall not be commissioned.
Please contact your
“GE Service Center”
.
Fig. 4.6-1 ShockWatch device
Fig. 4.6-2 TiltWatch device
NOTE !
Be aware of the heavy weight of the UPS, pay attention when moving the UPS
cabinet.
Take care not to damage the UPS when moving by forklift.
A damaged UPS must never be installed or connected to
Utility
or
Battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.
Included in the delivery you can find the following parts:
•
An accessories bag.
•
Air inlet grids, which must be mounted on the bottom of the cabinet UPS with the screws included.
•
Control Bus cables for inter-connecting the UPS modules (only For the RPA system).
•
The documentation includes the
“Installation Guide & User Manual”
and the
“UPS Safety Rules”
.
PACKING MATERIAL RECYCLING
GE
, in compliance with environment protection, use only environmentally
friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.