Critical Power
Modifications reserved
Page 25/69
GE_UPS_ISG_TLE_SUL_M62_1M0_2US_V010.docx
Installation Guide
TLE Series 625 - 750 - 1000 UL S2
4.7
INTER CABINET CONNECTIONS
4.7.1
Cabinets positioning and interconnection
NOTE !
The
“Power Section cabinet”
and
“In/Out Section cabinet”
must be installed on
leveled floor.
TLE Series 625 & 750 Cabinets positioning and interconnection
Fig. 4.7.1-1 TLE Series 625 & 750 – Cabinet positioning and interconnection
TLE Series 625 & 750
, in
standard version, is
delivered split into two
cabinets,
“Power Section
cabinet”
and
“In/Out
Section cabinet”
.
Align them together with
the
“Power Section
cabinet”
on the left side
(cabinet with
Control
Panel)
.
Pay attention, that no
loose cables are trapped
when pushing the
cabinets together.
Once finally positioned,
the two cabinets have to
be connected together
with power and control
wiring.
Refer to
Section 4.7.2
and
4.7.3
.
8 Bolt M6x12
Fixing type 2
Fixing type 3a
6 Bolt M6x12
Fixing type 1 (2 pc.)
8 Bolt M6x12
from base
6 Bolt M6x12
Fixing type 3b
In/Out Section cabinet
Power Section cabinet
TLES_UL_750_S2_U
PS connection cabin
ets_GE_01US
3a 2
3b 1
14.7
7"
375
mm
3.
94
"
10
0 m
m
9.
97
"
25
3 m
m
35
.5
5"
90
3 m
m
6.
89
"
17
5 m
m