173
Signatures and Relevant
Diagnostics
Scan Time [seconds]
Deviation Margin [%]
Sampling Rate [milliseconds] (not used in this function)
Performing measurements sets the pressure data in
SIGN_DATA_X and the position data (%) in SIGN_DATA_Y.
High Resolution
Actuator Signature *1
The high-resolution actuator signature is the valve
input-to-position characteristics, measured with high resolution
while sampling data at the specified time rate. Up to 100 data
values can be stored in the FVP100 memory. After this limit is
reached during measurement, the stored data is overwritten
from the leading data in order. Using ValVueFF, you can con-
tinue measurement while uploading the measured data. The
following is settable for EXT_ACT_SIGN_SET:
Lower Setpoint [%] (point to start the measurement)
Upper Setpoint [%] (point to finish the measurement)
Recommended Scan Time [seconds] (not used in this function)
Scan Time [seconds]
Deviation Margin [%]
Sampling Rate [milliseconds]
The sampling rate can be set within the range of 200 through
1000 milliseconds. The total number of measured samples is
obtained by the following formula:
Scan time / sampling rate 1000 [points]
Performing measurements sets the pressure data in
SIGN_DATA_X and the position data (%) in SIGN_DATA_Y.
Step Response Test
The step response test measures time-series changes in the
valve position in response to a sudden change (step) in the
positioner setpoint from the preset initial setpoint to the destina-
tion setpoint. The following is settable for STEP_RESP_SET:
Initial Setpoint [%]
Destination Setpoint [%]
Sampling Rate [milliseconds]
Number of Samples [points]
The sampling rate can be set within the range of 20 through
1000 milliseconds (corresponding to the measurement period
of 0.4 through 600 seconds). The number of samples can be
set to up to 600.
Performing measurements sets the positioner setpoints in
SIGN_DATA_X and the position data (%) in SIGN_DATA_Y.
Summary of Contents for FVP110
Page 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Page 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Page 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Page 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Page 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Page 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Page 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Page 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Page 239: ...223 LM Parameter List Link Master Functions ...
Page 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Page 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Page 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Page 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 289: ...273 H Customer Maintenance Parts List ...
Page 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Page 291: ......