233
Transducer Block
DD Methods and DD Menu
Search Stop Points
This method guides you through each step to search for the valve’s mechanical stop
positions (both on the closed and open sides) by maximizing and minimizing the output
pressure to the positioner.
Setup procedure
1. AO/TB block mode check
2. Auto tuning execution: AUTO_TUNE_EXEC
Control Parameter Tuning
This method helps perform control-parameter-specific tuning, from among the
parameters that can be tuned by the auto tuning function. It does not contain a help
utility for a stop point search (searching for the valve’s mechanical stop positions).
1. AO/TB block mode check
2. Execution of control parameter tuning: AUTO_TUNE_EXEC
Travel Calibration
This method guides you through each step to carry out travel calibration. See the
respective descriptions in “Carrying out Tuning” on page 61.
Travel calibration procedure:
1. AO/Transducer block mode check
2. Execute travel calibration
a. 0% calibration: Adjustment of FINAL_VALUE (by moving the valve position to
the desired 0% position)
b. Execute 0% calibration: TRAVEL_CALIB_EXEC
c. Span calibration: Adjustment of FINAL_VALUE (by moving the valve position to
the desired 100% position)
d. Execute span calibration: TRAVEL_CALIB_EXEC
e. 50% calibration: Adjustment of FINAL_VALUE (by moving the valve position to
the desired 50% position)
f.
Execute 50% calibration: TRAVEL_CALIB_EXEC
g. Exit
❑
Standard
❑
Without timeout
❑
Step by step
❑
Exit
Summary of Contents for FVP110
Page 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Page 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Page 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Page 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Page 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Page 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Page 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Page 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Page 239: ...223 LM Parameter List Link Master Functions ...
Page 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Page 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Page 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Page 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 289: ...273 H Customer Maintenance Parts List ...
Page 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Page 291: ......