237
AO Block
DD Methods and DD Menu
AO Block
Simulation Enable
This is a method for causing the AO block to activate the simulation status. When a
block is in the simulation status, you can apply simulated inputs to the block to let the
block function with that input, and check the actions of the function block application
and alarm processing. Since the simulation function is disabled to run normally in
consideration of the nature of its functionality, when using this method, the simulation
function needs to be rendered active by doing either of the following:
❑
Write
REMOTE LOOP TEST SWITCH” to SIM_ENABLE_MSG
in the resource
block.
❑
Turn on the SIM.ENABLE hardware switch on the YPV110’s amplifier assembly
(see “Simulation Function” on page 113).
Simulation enabling procedure:
1. Check that the simulation switch is ON (active).
2. Check the AO block mode.
3. Change the value of SIMULATE.status to
Enable
.
4. Set the simulated input value in SIMULATE.value.
Simulation Disable
This is a method for disabling the simulation function of the AO block.
Simulation disabling procedure:
1. Confirm whether the simulation function can be disabled.
2. Change the value of SIMULATE.status to
Disable
.
3. The method displays a message announcing that block alarms will not be reset until
both the hardware switch and software switch in the resource block for enabling
execution of the simulation function are turned off.
Summary of Contents for FVP110
Page 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Page 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Page 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Page 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Page 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Page 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Page 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Page 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Page 239: ...223 LM Parameter List Link Master Functions ...
Page 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Page 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Page 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Page 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 289: ...273 H Customer Maintenance Parts List ...
Page 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Page 291: ......