FVP 110 Fieldbus Valve Positioner Manual
54
GE Energy
Wiring
CAUTION
For flameproof equipment, wiring materials and wiring work
for this equipment including peripherals are strictly restricted.
Read “Installation and Operating Precautions for JIS
Flameproof Equipment” prior to the work.
Recommended Cables
For wiring for a FVP110:
❑
Use a cable for H1 fieldbus segments specified by the Fieldbus FOUNDATION™.
A shielded cable is recommended. For the details of cables required for H1
fieldbus segments, see
Fieldbus Technical Information
(TI 38K3A01-01).
❑
Choose cables suitable for the respective ambient temperature ranges, especially
when they are to be laid in a hot or cold place.
❑
Laying cables in or through a place where the atmosphere may include a toxic gas
or liquid, or oil or solvent requires wires and cables made of sufficient durability.
❑
Prevent the cables from being affected by noise induced from a high-capacity
transformer or power supply to a motor.
❑
Make the cables and connection adapters watertight and prevent the cables from
being damaged by using a cable conduit and duct.
General-use Type and Intrinsically Safe Type
1. Remove the terminal box cover and dust proofing plug (Figure 33). Be sure to
securely seal the unused wiring port with a blind plug.
Figure 33
Wiring
Summary of Contents for FVP110
Page 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Page 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Page 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Page 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Page 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Page 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Page 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Page 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Page 239: ...223 LM Parameter List Link Master Functions ...
Page 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Page 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Page 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Page 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 289: ...273 H Customer Maintenance Parts List ...
Page 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Page 291: ......