Communication Setting
Configuration
Communication Setting
To set the communication function, it is necessary to change the database residing in
SM-VFD.
VCR Setting
Set VCR (Virtual Communication Relationship), which specifies the called party for
communication and resources. FVP110 has 29 VCRs whose application can be
changed, except for the first VCR, which is used for management. Change parameters
together for each VCR, as modification for each parameter can cause inconsistent
operation.
FVP110 has VCRs of four types:
Server (QUB) VCR
A Server responds to requests from a host. This communication
needs data exchange. This type of communication is called
QUB (Queued User-triggered Bidirectional) VCR.
A Server VCR is capable to respond to requests from a Client
(QUB) VCR after the Client initiates connection to the Server
successfully.
Source (QUU) VCR
A Source multicasts alarms or trends to other devices. This type
of communication is called QUU (Queued User-triggered Unidi-
rectional) VCR.
A Source VCR transmits data without established connection.
A Sink (QUU) VCR on another device can receive if the Sink is
so configured.
Publisher (BNU) VCR A Publisher multicasts AI block output to another function
block(s). This type of communication is called BNU (Buffered
Network-triggered Unidirectional) VCR.
A Publisher VCR transmits data when LAS so requests.
Subscriber (BNU)
VCR
A Subscriber receives the data from another function block(s).
This type of communication is called BNU (Buffered Net-
work-triggered Unidirectional) VCR.
An explicit connection is established from Subscriber (BNU)
VCR(s) so that a Subscriber knows the format of published
data.
Function Block Execution Control
Use the instructions given in “Definition of Combining Function Blocks” on page 92 to
set the execution cycle of the function blocks and schedule of execution.
Summary of Contents for FVP110
Page 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Page 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Page 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Page 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Page 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Page 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Page 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Page 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Page 239: ...223 LM Parameter List Link Master Functions ...
Page 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Page 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Page 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Page 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 289: ...273 H Customer Maintenance Parts List ...
Page 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Page 291: ......