background image

10

Back-up Output Breaker

CT1

Meter  CT Communication

Grid

Power meter

CT2

Load

Battery

 DC Breaker

NTC

BMS

On-grid Output Breaker

Main 

Breaker

Auto-transformer

Automatic 

Transfer Switch

1

3

2

4

Wiring System for GEC-US Series Inverter (Full Load)

Turn on

Turn off

1

2

4

3

1

2

4

3

Wiring System

Power ON

Power OFF

Summary of Contents for GEC 5.0kW G1 Split Phase

Page 1: ...GEC 5 0 9 6kW G1 US Split Phase Quick Installation Guide www gesolarinverter com Ver 1 2 AC Coupled Inverter ...

Page 2: ...ls please visit https www gesolarinverter com DC Side 1 Ensure the component frames and the bracket system are securely grounded 2 Connect the DC cables using the delivered PV connectors The manufacturer shall not be liable for equipment damage if other connectors are used 3 Ensure the DC cables are connected tightly securely and correctly Inappropriate wiring may cause poor contacts or high imped...

Page 3: ...yed discharge Wait 5 minutes after power off until the components are completely discharged Read through the guide before working on this device Potential risks exist Wear proper PPE before any operations High temperature hazard Do not touch the product under operation to avoid being burnt Grounding point Indicates the position for connecting the PE cable CE marking Do not dispose of the inverter ...

Page 4: ...cted OFF The grid is not active ENERGY ON Consuming energy from grid buying BLINK 1 Supplying energy to grid zeroing BLINK 2 Supplying energy to grid selling OFF The grid is not connected or the system is not working COM ON Both BMS and meter communication are ok BLINK 1 BMS communication fails meter communication is ok BLINK 2 BMS communication is ok meter communication fails OFF BMS and meter co...

Page 5: ... INPUT 4 Auto transformer Terminal A TX 5 Backup Terminal BACK UP 6 On Grid Terminal GRID 7 BMS 8 Meter CT Terminal 9 EMS 10 PE Terminal 11 WiFi Module 12 LG Enable 12V Power Dry Contact 1 2 3 4 5 6 7 8 9 10 10 12 11 02 Product Introductions Parts ...

Page 6: ...0mm 4 3in 110mm 4 3in 120mm 4 7in 140mm 5 5in 120mm 4 7in 120mm 4 7in 200mm 7 9in 35mm 1 4in 841mm 33 1in 345mm 13 6in 174mm 6 9in 110mm 4 3in 120mm 4 7in 120mm 4 7in 110mm 4 3in 277mm 10 9in Auto Transformer GEC Inverter Dimensions ...

Page 7: ... 1 x 7 x 4 x 1 x 1 x 2 x 4 x 1 x 8 x 1 x 1 x 1 x 3 x 2 x 3 x 1 x 1 means the number of actual accessories may differ depending on different model x N Auto Transformer GEC Inverter 03 Inverter Installation Packing List ...

Page 8: ...1in 200mm 7 87in 300mm 11 81in 100mm 3 94in 100mm 3 94in 48 5lb 22kg 0 95 RH 31 F 140 F 35 C 60 C NEMA 4X 500mm 19 69in 300mm 11 81in 300mm 11 81in 200mm 7 87in 200mm 7 87in 66lb 30kg Space Requirements Angle Requirements ...

Page 9: ...08 Avoid the water pipes and cables buried in the wall when drilling holes 1 2 3 4 5 1 2 3 4 5 Auto Transformer GEC Inverter Installing the Inverter ...

Page 10: ...09 1 1 1 1 2 2 1 2 2 1 2 3 4 5 6 7 1 2 04 Electrical Connection Preparations Before Electrical Connections ...

Page 11: ...rid Power meter CT2 Load Battery DC Breaker NTC BMS On grid Output Breaker Main Breaker Auto transformer Automatic Transfer Switch 1 3 2 4 Wiring System for GEC US Series Inverter Full Load Turn on Turn off 1 2 4 3 1 2 4 3 Wiring System Power ON Power OFF ...

Page 12: ...ransformer Temp sense T1 T2 22AWG 20 24AWG 600V insulated AC Backup L1 N L2 8AWG 8 12AWG AC Grid L1 N L2 8AWG 8 12AWG 1 Conduit 1 Conduit 50A CB 50A CB Neutral Bus bar From Utility Meter ATS BOX 1 Conduit Two Meter CTs Battery BAT BAT 6AWG 6 12AWG 1 Conduit Ground Bus bar BMS Cable 22AWG 20 24AWG 600V insulated CT 1 CT 2 To Main Panel 50A CB 50A CB 200A CB Note 1 Note 2 Note 2 Controller PE L2 L1 ...

Page 13: ... PE N L2 L1 Grid Power Meter Main Breaker CT2 Battery DC Breaker NTC BMS Back up Breaker 120V Loads 240V Loads Auto transformer PE N L2 L1 1 3 2 4 5 Wiring System for GEC US Series Inverter Partial Load Turn on Turn off 1 2 4 3 5 1 2 4 3 5 Power ON Power OFF ...

Page 14: ...90 6AWG Battery Auto transformer BACKUP Loads Distribution Panel BACKUP Panel Main Breaker Neutral Bus bar BACKUP Panel Loads Breakers To BACKUP Loads 240V BACKUP Loads 120V BACKUP Loads Note 1 L1 L2 N To Utility Meter Main Breaker Main Distribution Panel CB CB CB CB CB CB CB 50A CB CB CB CB CB CB 50A CB Two Meter CTs Ground Bus bar Note 2 CT1 CT2 Note 3 PE AC BACKUP L1 N L2 90 8 10AWG AC Grid L1 ...

Page 15: ...14 1 18mm 0 71in Φ max 7 4mm 0 29in Φ max 7 4mm 0 29in 18mm 0 71in 18mm 0 71in Φ max 7 4mm 0 29in 90 Copper 6 AWG 2 3 1 2 Battery Cable ...

Page 16: ...15 L2 L1 N 1 18mm 0 71in Φ max 7 4mm 0 29in Φ max 7 4mm 0 29in 18mm 0 71in Φ max 7 4mm 0 29in 18mm 0 71in 90 Copper 8 10 AWG 2 3 1 L2 L2 L1 N N L1 L2 N L1 AC Cable On Grid ...

Page 17: ...16 L2 L1 N 3 1 18mm 0 71in Φ max 7 4mm 0 29in Φ max 7 4mm 0 29in 18mm 0 71in Φ max 7 4mm 0 29in 18mm 0 71in 90 Copper 8 10 AWG 2 L2 N L1 L2 N L1 N L1 L2 AC Cable BACKUP ...

Page 18: ...17 To CT 1 1 2 2 Type One CAN1 Battery CAN1 Communication 1 2 1 1 2 3 CAN1 BMS Cable 22AWG 600V Insulated CT Cable BMS ...

Page 19: ...18 Type Two LG Battery 485 Communication GEC LG Battery NC CAN_H LG_EN EN GND LG_EN ENABLE_H 485 1A RS485_H 485 1B RS485_L NC CAN_L 1 2 1 1 2 3 1 2 3 1 2 1 LG_EN LG_EN LG_EN LG_EN 485 ...

Page 20: ... Module Auto transformer Optional L1 N L2 PE NTC 2 L1 L2 N PE NTC 1 Φ max 7 4mm 0 29in 18mm 0 71in 18mm 0 71in 18mm 0 71in 7mm 0 28in 90 C Copper 8 10 AWG 22 24 AWG 600V insulated Φ max 7 4mm 0 29in Φ max 7 4mm 0 29in ...

Page 21: ...orage Mate Commissioning via Storage Mate App Storage Mate APP 05 Commissioning and Monitoring play App Store Power Sight Monitoring via Power Sight App Power Sight APP For more detailed instructions scan the QR codes below GEC Series User Manual ...

Page 22: ...f General Electric Company and is used under license by GoodWe Technologies Co Ltd 2022 All Rights Reserved Local Contacts 340 00556 02 No 90 Zijin Rd New District Suzhou 215011 China www gesolarinverter com sales gesolarinverter com support1 gesolarinveter com ...