50
07 Equipment Commissioning
User Manual
V1.0-2023-10-30
WARNING
When power on the parallel system, make sure that all the AC breakers of the slave inverters are
powered on within one minute after powering on the AC breaker of the master inverter.
6
5
Parallel System
Turn on:
ON-GRID
AC breaker
ON-GRID
AC breaker
ON-GRID
AC breaker
Load
BACK-UP AC breaker
BACK-UP AC breaker
BACK-UP AC breaker
5
5
5
2
4
4
1
3
3
6
6
6
Master
inverter
Slave
inverter 1
Slave
inverter n
n≤5
PV string
PV string
PV string
Battery
breaker
Battery
breaker
Battery
breaker
Utility
grid
Battery
Battery
Battery
6
Only for
Australia.