background image

4.2 Equipment Installation

4.2.1 Select installation location

Please take the following points into consideration when you selecting a proper location to install 
inverter. 
1. Please choose appropriate mounting methods and installation location taking both the weight 

and dimension of inverter into account.

2. The location must be well ventilated and sheltered from direct sunlight.
3. Install  the inverter vertically or with a backward tilt up to 15 degrees maximum. No lateral tilt is 

allowed. The inverter should not be tilted sideways. The area of the connectors should point 
downwards.

4 Installation

4.1 Mounting Instructions

 

1. In order to achieve optimal performance, the ambient temperature should be lower than 45

.

2. For easy maintenance, we suggest to install the inverter at eye level.
3. Inverters should not be installed near flammable and explosive items. Strong electro-magnetic 

charges should be kept away from installation site.

4. Product label and warning symbols should be located and placed in a manner that can be easily 

ready by users.

5. Ensure the inverter is installed in a location that is protected from direct sunlight, rain and snow.

Accmulated snow

Keep away

from sunlight 

Keep dry

Keep it clear

of snow

Sun

Rain

3.2  Package

The unit is thoroughly tested and strictly inspected before delivery. Damage may still occur during 
shipping.

1. Check the package for any visible damage upon receiving.

2. Check the inner contents for damage after unpacking.

3. Check the package list below.

 Positive DC Plug x3

Negative DC Plug x3

Inverter

AC Terminal x1

User Manual 

x1

Wi-Fi/LAN Configuration

Instruction x1

Wi-Fi Module

(Wi-Fi Communication

 Only) x1

Pin Terminal x4

PE Terminal x1

Expansion Bolts x6

Grounding Screw x2

Wall-mounted 

Bracket x1

LAN Module

(LAN Communication

 Only) x1

CT/RS485 Terminal x1

Maximum

15°

05

06

Summary of Contents for GEP10S

Page 1: ...33 support au gesolarinverter com sales au gesolarinverter com Global Sales Service Network GEP 4 6 10KW SINGLE PHASE USER MANUAL GE is a registered trademark of General Electric Company and is used under license by Jiangsu GoodWe Power Supply Technology Co Ltd 2020 All Rights Reserved 340 00468 02 ...

Page 2: ...al Connection 08 4 4 Communication Connection 12 5 System Operation 16 5 1 LCD Panel 16 5 2 User Interface and System Configuration 17 5 3 Wi Fi LAN Reset Wi Fi LAN Reload 22 5 4 Precaution for Initial Startup 22 5 5 Special Adjustable Setpoints 23 6 Troubleshooting 26 7 Caution 28 7 1 Checking The DC Switch 28 7 2 Checking The Electrical Connection 28 8 Technical Parameters 29 TABLE OF CONTENTS ...

Page 3: ...ed to prevent such damage otherwise the warranty may be null and void Ensure the output voltage of the proposed PV array is lower than the maximum rated input voltage of the inverter otherwise the inverter may be damaged and the warranty may be null and void When exposed to sunlight the PV array generates dangerously high DC voltage We strongly advise operators strictly follow instructions and avo...

Page 4: ...ty extension solution for our customer For further details please visit www gesolarinverter com Item 1 2 3 4 5 6 7 8 9 Name DC Switch PV Input Terminal Wi Fi LAN Module Optional DRED Function Optional CT and RS485 Optional AC Output Terminal LCD Display Indicator Lights Buttons Description During normal operation it is in on state and it can shut down the inverter after the inverter is disconnecte...

Page 5: ... be installed near flammable and explosive items Strong electro magnetic charges should be kept away from installation site 4 Product label and warning symbols should be located and placed in a manner that can be easily ready by users 5 Ensure the inverter is installed in a location that is protected from direct sunlight rain and snow Accmulated snow Keep away from sunlight Keep dry Keep it clear ...

Page 6: ...y Grade A B C D Description Outside diameter Separated wire length Conductor wire length Conductor core section Value 13 18mm 20 25mm 7 9mm 2 5 10mm2 D A B Annealed copper wire C Cables Screw cap AC sheet cover Single hole seal ring The insulator Inverter GEP4 6 1C 10 GEP5 0 1C 10 GEP7 0 1 10 GEP8 5 1 10 GEP9 0 1 10 GEP10 1 10 Conductor core section 2 5mm2 4mm2 10mm2 4 3 Electrical Connection 4 3 ...

Page 7: ... PE wire ground wire Not following this instruction may cause damage to the inverter 5 Red wire represents positive black wire represents negative 6 For the GE series the minimum insulation resistance to the ground of the PV panels must exceed 20kΩ R 600 30mA There is risk of electric shock if this minimum resistance requirement is not met Inverter Model GEP4 6 1C 10 GEP5 0 1C 10 GEP7 0 1 10 GEP8 ...

Page 8: ...ed metal parts of the equipment and other enclosures in the PV power system must be grounded Please follow the steps below to connect PE cable to ground L1 L2 L1 1 2mm Step 1 Strip the wire insulation sheet of a suitable length with a wire stripper Step 2 Insert the stripped wire into the terminal and compress it tightly by crimping pliers Step 3 Fix the earth wire In order to improve the corrosio...

Page 9: ...d installations in compliance with Australian and New Zealand safety requirements and DRED is not provided by the manufacturer DRED should be connected to the COM port with 6 Pin as illustrated below Please connect the cables in order as shown in the right table CT Power Limit Device and RS485 communication ports are optional based on the demand of the clients Function CT CT NO 5 6 CT Function RS4...

Page 10: ...tion of commu nication connection you can access portal gesolarinverter com or download the Power Sight App by scanning the QR code to monitor your PV plant and device Please contact after sales for further details 4 4 4 Export Power Limit Connection Diagram The methods of connecting the Power Limiting device CT is shown below For the detailed installation procedure of CT please refer to Step 4 of...

Page 11: ... 6000W Or Or Power Limit ON Pac 6000W Power Limit OFF Pac 6000W Set Power Limit XXX Set Power Limit XXX Set Modbus Addr Pac 6000W Short Press Long Press Short press short press to select Leading or Lagging Short Press to select number 8 or 9 Short Press to select number 0 9 Short Press to select number 0 9 Long Press Disable Lagging 0 95 Lagging 0 95 Lagging 0 95 Long Press Wait W L Reloading W L ...

Page 12: ... E Today menu which displays the total power generation for today Short press the button to enter the E Total menu which displays the total power generation up to today Short press the button to enter the menu which displays the PV1 voltage in V and current in A Short press the button to enter the menu which displays the PV2 voltage in V and current in A Short press the button to enter the menu wh...

Page 13: ... Set Power Limit XXX Long press 2S 6 Operation of display under grid connected mode When the input voltage reaches the inverter s start up voltage the LCD starts to work the yellow light will be turned on and the LCD will display Waiting More information will be displayed within a few seconds If the inverter is connected to the grid Checking XXs will be displayed and a countdown will commence from...

Page 14: ...specifically according to the inverter Modbus address and Modbus register value according to the set range to set the corresponding value PF Power Curve Mode Function PF curve mode enable or disable B P Prated C Power factor Default value Australia 0 50 50 0 9 Default value New Zealand 0 50 50 0 9 Setting range 0 or 1 30 80 0 8 1 Register 40600 40603 40606 V1 V2 V3 V4 V1 V2 V3 V4 100 80 60 40 20 0...

Page 15: ...e refer to the following instructions before contacting your local service If any problems arise the red FAULT LED indicator on the front panel will light up and the LCD screen will display relevant information Please refer to the following table for a list of error messages and associated solutions 1 Disconnect DC switch take off DC connector check the impedance between PV PV to earth 2 If impeda...

Page 16: ...t s possible that there are special characters not supported by the module in the hotspot password Please modify the password so that it consists of only Arabic numerals or uppercase lowercase letters 2 If the problem still persists contact local service office for help 7 Caution 7 1 Checking The DC Switch DC switch does not require any maintenance It is recommended though not compulsory to Check ...

Page 17: ...120 360 80 600 0 13 13 13 16 3 16 3 16 3 3 1 1 1 4600 4600 230V 50 20 3 150 120 80 97 7 97 3 GEP7 0S 13500 600 80 550 80 120 360 80 600 0 13 13 13 16 3 16 3 16 3 3 1 1 1 7000 7000 230V 3 50 1 35 1 Adjustable from 0 8 leading to 0 8 lagging 3 150 120 80 97 6 97 2 Integrated Integrated Integrated Integrated Type Ⅱ Integrated Type Ⅱ Integrated Integrated Integrated Integrated Class Ⅰ C 25 60 0 100 40...

Page 18: ...res Moisture Location Category Definition Environment Category Definition Outdoor the ambient air temperature is 20 50 Relative humidity range is from 4 to 100 applied to PD3 Indoor unconditioned the ambient air temperature is 20 50 Relative humidity range is from 5 to 95 applied to PD3 Indoor conditioned the ambient air temperature is 0 40 Relative humidity range is from 5 to 85 applied to PD2 Po...

Reviews: