Removing the Slow Operation Device
• Turn the hexagon nut (22) counterclockwise until enough
pressure is removed from the hook (19) that the slow operation
device (15) can be removed.
Relocking the Manual Releases
• Loosen the M6 screws.
• Slide the manual release locking device (7) in the direction of the
arrow until manual releases (8) and (9) are locked.
• Retighten the M6 screws.
Operating State of the Spring Mechanism after the Slow
Opening Operation
7 Manual closing release
9 Manual release locking device
8 Manual opening release
Position of Position Indicator
Spring position indicator shows clo-
sing spring is uncharged or charged
Breaker position indicator
is in open position,
opening spring is dischar-
ged
9
7
8
M6
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...