I
NSTALLATION
REV7
/REV7
OI 250 (EN)
Checklist for Installation and Commissioning
Please send one completed and signed copy of the checklist to:
GE Grid GmbH, Service Germany, Lilienthalstrasse 150, 34123 Kassel, Germany,
Fax: +49 561 502-2774, e-mail: checkliste.kassel@alstom.com
Place Date Stamp Signature
Circuit Breaker Data
Type & Serial No.:
Customer:
Station:
Commissioning:
No.
Operation to Be Performed
Section
or Value
1
Safety instructions have been carefully read and are under-
stood
2
Safety instructions for SF
6
handling have been carefully read
and are understood
3
Density monitor mounted and electrically connected
4
Pole columns inspected visually
5
SF
6
piping mounted
6
Operating points of density monitor checked
7
SF
6
piping connected to the pole columns
8
SF
6
gas topped up to rated pressure as shown on nameplate
9
SF
6
piping seals checked using SF
6
leak detector
10
Resistance of anti-condensation heater checked [in ohms]
11
Supply and control cables connected
12
Five closing and five opening operations executed by remote
control
13
Running time of charging motor measured
s
14
Contact resistance measured (> 100A DC)
µ
15
Closing time [ms] checked
A ms
B ms
C ms
16
Opening time [ms] checked
A ms
B ms
C ms
17
Manual closing & opening operations checked
18
Anti-pumping system checked
19
Synchronized operation checked
20
Functional lockout checked
21
Count shown on operations counter recorded
22
Testing and measuring equipment removed
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...