I
NSTALLATION
REV7
/REV7
OI 250 (EN)
6.6
Mounting the Connecting Brackets
Lattice supports are connected with one another by connecting
brackets. Note the positions of the oblong hole and the guide hole
in the connecting brackets (views X, Y and Z).
• Position the connecting bracket (1) between poles A and B on the
horizontal strut (views T and U).
• Fasten the bracket to pole B via the guide hole (view Y) using the
bolt (2), washer (4) and nut (5) (view U).
• Fasten the bracket to pole A via the oblong hole (view X) using
the bolt (2), washer (4) and nut (5) (view T). Tighten to a torque of
202 Nm.
• Position the connecting bracket (1) between poles B and C on the
mounting flange for the pole columns (views V and W).
• Fasten the bracket to pole C via the guide hole (view Z) using the
bolt (3), washer (4) and nut (5) (view W).
• Fasten the bracket to pole B via the oblong hole (view Y) using
the bolt (3), washer (4) and nut (5) (view V). Tighten to a torque of
202 Nm.
The correct center-to-center distance between poles is achieved
when the connecting brakkets are mounted as shown in views X, Y
and Z.
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...