I
NSTALLATION
REV7
/REV7
OI 250 (EN)
6.7
Mounting the Density Monitor and Filler Block to Pole B
• Mount the density monitor, filler block and bracket (1) using the
bolt (2), washer (3) and nut (4) at the specified position on the
lattice support (view X). Tighten to a torque of 25 Nm.
In breaker configurations with three density monitors, the list
below must be repeated for poles A and C. The design of the
mounting bracket for the density monitor may differ from the
picture shown below.
1
Density monitor, filler block and bracket
1x
2
Bolt, M8 x 20 A2-70
2x
3
Washer, 8.4 A2
2x
4
Nut, M8 A2-70
2x
1
BA-
P-V
E
-1
2040021_4
BA
-P-V
E-2
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...