I
NSTALLATION
OI 250 (EN)
REV7
/REV7
6.9.3
Connecting the Drive Rod to the Drive Lever
• Lubricate the flanged coupling pin (14) as per L2.
• Connect the drive rod (5) and the drive lever (4) using the flanged
coupling pin (14), while maintaining the installation position of the
drive rod. The side of the drive rod with the hexagon nut faces
Pole B.
• Apply locking adhesive S1 to the screw (13).
• Lock the flanged coupling pin (14) using the locking sleeve (11),
washer (12) and screw (13). Tighten to a torque of 7Nm.
2
Pole B
1x
4
Drive lever
1x
5
Drive rod
1x
11
Locking sleeve
1x
12
Washer, 6 A2
1x
13
Hexagon screw, M6x16 A2-70
1x
14
Flanged coupling pin, 16x68
1x
2
4
5
11
12
13
14
B
A
-P
-B-A
NT
R-HE
B
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...