C
OMMISSIONING
REV7
/REV6
OI 250 (EN)
7.2.4
Connecting the Gas Piping to The Pole Columns
• Grease the threads of the gas couplings as per L4.
• Connect the gas piping to the pole column (to all pole columns).
Screw on the filling connection(s) (8) initially by hand, then tighten
provisionally using tool T022, and finally tighten using tool set
WK001. Tighten to a torque of 30 Nm. Use two wrenches for
connecting the filling connection(s).
• Retighten all couplings in the gas piping system.
We recommend that the gas cylinder be weighed before and af-
ter the filling operation and that the weight difference be compa-
red with the gas weight specified on the nameplate.
This makes it possible to verify that the filling process has been
carried out correctly.
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...