C
OMMISSIONING
OI 250 (EN)
REV7
/REV6
7.6.11
Final Tasks
• Remove all testing and measuring equipment from the circuit
breaker.
• Replace the roof and side panels of the mechanism after work is
completed. Tighten the bolts (6) and nuts (5) to a torque of 17Nm.
• Clean up the installation site.
The breaker is ready to be connected to the high voltage system.