Tools and Auxiliary Equipment
A2.1
Customer-Supplied Materials and Equipment for Installation
and Commissioning
Customer-supplied materials and equipment are not included in the
order or supplied by the manufacturer. They must be provided at
the site by the customer.
Materials and equipment listed in sections A2.4 to A2.9 may be
purchased from the GE Service Germany.
A2.2
Materials
- Foundation including anchor bolts, nuts, and washers
- Earthing (grounding) conductors including terminals and
fasteners
- Supports / lattice supports conforming to GE Grid GmbH
drawings
- High voltage terminal pads including fasteners
- Gas for filling the breaker
- Squared timbers and boards on which pole columns can rest
before installation.
A2.3
Hoisting and Climbing or Lifting Equipment
- Crane of sufficient lift height and load-carrying capacity
- Slings and lifting tackle of sufficient load-carrying capacity
- Ladders or lifting platforms.
A2.4
Tools, Test Equipment and Auxiliary Equipment
- Gas-filling device with pressure reducing valve and type Dilo DN8
coupling
- SF
6
leak detector
- Multimeter
- Measuring device for determining operating times
- Measuring device for determining contact resistance
- Assembly tools based on our tool recommendations
- Metal brush with stainless steel bristles.
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...