C
OMMISSIONING
REV7
/REV6
OI 250 (EN)
7.2.1
Installing the Gas Piping for Circuit Breaker with One Density Monitor
(Standard Configuration)
We recommend that the following tools be used to connect the gas
couplings:
- T022:
Compact open-end wrench (open-ended spanner),
SW27
- WK001: Torque wrench (spanner) with ratchet adapter and
SW27 open-end wrench head
• Remove the protective caps from the gas couplings on the pole
columns and the gas piping.
• Lubricate O-ring (5) per L5 and slide it onto the sleeve (6) so that
it is centered.
• Insert the sleeve (6) with O-ring (5) in the screw-in connector (9).
• Apply locking adhesive to the external thread of the screw-in
connector (9) per L1.
• Insert the pieces of gas piping (2, 3 and 4) one after the other into
the respective screw-in connectors (9) and screw tight using
union nuts (7). Tighten to a torque of 30 Nm.
1
Filler block with density monitor and central sup-
ply connection
1x
2
Gas piping for pole A
1x
3
Gas piping for pole B
1x
4
Gas piping for pole C
1x
5
O-ring
3x
6
Sleeve
3x
7
Union nut
3x
8
Filling connection
3x
9
Screw-in connector
3x
X
X
4
7
3
7
9
1
2
7
8
5
6
9
9
B
A
-P
-VE
-9
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...