R
ECONDITIONING
OI 250 (EN)
REV7
/REV7
10.1.15
Final Operations
• Evacuate the breaker.
• Fill the breaker with gas and check all seals for leakage
“Filling the Breaker with Gas” on Page 56)
10.2
Disassembling the Post Insulator and Crankcase
Requirements
- The interrupter chamber has already been disconnected from the
post insulator.
- The levers of the circuit breaker linkage have been removed.
• Fasten the lifting tackle to the upper flange of the post insulator
and hook the tackle in the crane hook.
• Detach the post insulator from the base frame.
• Carefully lift the post insulator and crankcase assembly up out of
the base frame and set it down on a suitable work surface.
• Remove four bolts (67) and two nuts (66) from the crankcase
mounting system.
• Pull the crankcase and insulating rod out of the post insulator.
• Reverse the sequence to assemble the components. In the
process, replace the gasket (35).
27
Washer, 12 A2
6x
35
Formed gasket 221
1x
66
Hexagon nut, M12 A2-70
2x
67
Hexagon bolt, M12x40 A2-70
4x
66
67
35
27
BA-
P-K
U
KA
-3
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...