ROUTE AND ATTACH THE WATER
TUBE
Fasten the plastic water tube to the back of the
refrigerator with adhesive-backed fasteners (4),
spacing the fasteners as shown to take up slack in
the tube.
5
WATER VALVE INSTALLED
Refer to the Water Line Installation Instructions for
connection to the home water supply. After water line
installation is completed, set the feeler arm to ON.
The icemaking cycle will not begin until the
icemaker and freezer compartment reach
operating temperature, then icemaking will begin
automatically.
6
Installation Instructions
$GKHVLYHEDFNHG
IDVWHQHUVIRUZDWHUWXEH
16
)RUPRGHOVZLWKRQH
temperature control
(refrigerator) only.
)RUPRGHOVZLWKWZR
temperature control (refrigerator
and freezer) only.
WATER VALVE ASSEMBLY INSTALLATION INSTRUCTIONS (cont.)
Summary of Contents for GTZ21GCESS
Page 62: ...62 Notes...