GE M
EDICAL
S
YSTEMS
D
IRECTION
2392751-100, R
EVISION
3
V
IVID
™ 4 S
ERVICE
M
ANUAL
8-50
Section 8-5 - Back End Parts Replacement
PCB: Frame Grabber (RFI systems only) -
Frame Grabber Board Removal Procedure
.
PCB: Keyboard Ctrl. Card -
Keyboard Control Board Removal Procedure
PCB: PC2IP Card -
see
8-5-2-4
Back End Processor Installation Procedure
NOTE:
When performing this procedure, handle boards carefully and take the following precautionary measures:
CAUTION:
DO NOT TOUCH ANY BOARDS WITH INTEGRATED CIRCUITS PRIOR TO
TAKING THE NECESSARY ESD PRECAUTIONS:
1.ALWAYS CONNECT YOURSELF, VIA AN ARM-WRIST STRAP, TO THE ADVISED ESD
CONNECTION POINT LOCATED ON THE REAR OF THE SCANNER (TO THE RIGHT OF
THE POWER CONNECTOR).
2.FOLLOW GENERAL GUIDELINES FOR HANDLING OF ELECTROSTATIC SENSITIVE
EQUIPMENT.
NOTE:
Care should also be taken to install the boards in the correct slots - refer to
on page 8-47, as applicable.
1) Install the MO Driver into the new BEP, as described in the
MO Drive Installation Procedure
,
if applicable.
2) Remove the Octopus Card Holder as described in the
BEP2 - Octopus Card Holder Removal
3) Install the SCSI Board, as described in the
SCSI Board Installation Procedure
applicable.
4) Install the ECG Module, as described in the
BEP2 - ECG Module Installation Procedure
5) Install the PC VIC Assembly, as described in the
6) Install the Plug and Scan Battery (if applicable), as described in the
Plug & Scan Battery Installation
7) Install the Plug and Scan Board (if applicable), as described in the
Plug & Scan Board Installation
8) Install the PC2IP Board, as described in the
PC2IP Board Installation Procedure
9.) Install the Frame Grabber Board (RFI systems only), as described in the
10) Install the Keyboard Control Card, as described in the
Keyboard Control Board Installation
11) Install the Octopus Card Holder as described in the
BEP2 - Octopus Card Holder Installation
12) Carefully return the new BEP to the original position on the machine chassis.