19
fuel supply system
Ensure that all fuel pipe connections are tight, secure and
without leaks.
Ensure that all gas line shutoff valves are OPEN and that
adequate fuel pressure is available whenever automatic
operation is desired.
engine oil
This engine is shipped from the factory pre-run and filled with
synthetic oil (SAE 5W-30). This allows for system operation in
a wide range of temperature and climate conditions. Before
starting the engine, check oil level and ensure that engine is
serviced as described in the engine operator’s manual.
note: The use of synthetic oil does not alter the required oil
change intervals described in the engine operator’s manual.
final installation considerations
Battery
The installer must supply and install a valve-regulated
rechargeable 12 volt starting battery. The starting battery
MUST conform to the specifications shown in this chart.
Battery specifications
Volts
12 Volt DC
Amps (MIN)
350 CCA (cold cranking amps)
Type
AGM
Terminal Hardware M8
Dimensions (MAX):
Width
5.325 inches (135mm)
Length
7.875 inches (200mm)
Height
6.875 inches (175mm)
install the battery as described in
Servicing the Battery
in
the
Maintenance
section of the operator’s manual. Always
make sure the neGatiVe cable is connected last and that
the red POSITIVE terminal insulator is fully in place.
NOTICE
: Any attempt to crank or start the engine before it has
been properly serviced with the recommended oil will result in
equipment failure.
Refer to
•
Maintenance
in the operator’s manual and engine
manual for oil fill information.
Damage to equipment resulting from failure to follow this
•
instruction will void engine and generator warranty.
WarninG: Battery posts, terminals and related accessories
contain lead and lead compounds, chemicals known to the State
of California to cause cancer and reproductive harm. Wash hands
after handling.