background image

 

 

Infinity S (NE-S) Dual Voltage Power System 

– Quick Start Guide 

Document 8600243957P Rev 2 Jan 2019

 

 

GE

 

Critical Power

 

 

6

 

Information: AC Cord Options

 

 
 

IEC-Style, 8ft, 12AWG

 

Part Number

 

Plug

 

Length

 

CC848847368

 

No plug

 

8 ft

 

CC848850792

 

5-15P

 

8 ft

 

CC848850801

 

5-20P

 

8 ft

 

CC848850826

 

6-15P

 

8 ft

 

CC848850834

 

6-20P

 

8 ft

 

CC848850842

 

L6-20P

 

8 ft

 

850044361

 

L5-15P

 

15 ft

 

850044362

 

L5-20P

 

15 ft

 

CC848895961

 

L6-20P

 

15 ft

 

Molex mini-fit SR-Style, No Plug 

 

CC848822420

 

(2) 15 ft., 3X8AWG

 

848710711 

 

(2) 10 ft., 3X8AWG

 

CC848830522

 

(2) 4 ft., 3X8AWG

 

CC848773515

 

15 ft., 10AWG SO Cord

 

CC848906586

 

10 ft., 8AWG, SO Cord

 

 

Information: Battery Monitoring Connections

 

Battery Monitoring is accomplished with a “Daisy Chained” series of probes connected to J2. The Probes monitor battery 
temperature and voltage (ES771 required to monitor voltage). Bolt the Probe under the negative terminal connector 
hardware; NOT under the connecting lug.

 

 

 

 

 

 

Temperature Measurement

 

Temperature and Voltage Measurement

 

 

Information: Battery Monitoring Connections - cables

 

 

 

 

 

 

 

Temperature Measurement only

 

Temperature and Voltage Measurement

 

 

Order Codes 

Descriptions 

CC109142980 

QS873A Thermal Probe 

150026698 

QS873B Ambient Thermal Probe 

CC848817024 

B

 

10’ controller to thermal probe 

wire set 

CC109157434 

B

 

20’ controller to thermal probe 

wire set 

CC848822560 

C

 

1’ thermal probe to thermal probe 

wire set 

848719803 

C

 

5’ thermal probe

 to thermal probe wire set 

CC848822321 

C

 

10’ thermal probe to thermal probe wire

 set 

850027334 

C 20’ wire set (

thermal probe to thermal probe) 

Order Codes 

Descriptions 

108958422 

ES771A Voltage Monitor Card 

CC848791517 

2 ½’ ES771A to probe wire

 set 

CC848797290 

6’ ES771A to probe wire

 set 

848719829 

10’ ES771A to probe wire

 set 

CC848791500 

4’ ES771A to ES771A or controller wire

 set 

848652947 

10’ ES771A to ES771A or controller wire

 set 

555052-1 

In-Line Coupler (for extending item G above) 

Summary of Contents for Infinity S

Page 1: ... twelve six on each side 12 24 screws provided Torque to 35 in lb 4 Nm 5 16 socket Step 2 Connect Chassis and DC reference CO ground Chassis Ground lug 10 or 1 4 on 5 8 centers not provided Minimum 10 AWG recommended Torque to 10 32 screws to 30 in lb 3 4 Nm 5 16 Socket DC reference ground lug 5 16 or 3 8 on 1 centers not provided Torque to 160 in lb Note If connecting chassis ground to frame surf...

Page 2: ...L1 L2 N and Gnd AC Terminal Block is in the AC box on the rear of the rectifier shelf Connect AC input cord to the detachable input terminal block in the wiring box knock out for conduit or cord grip Strip and torque per the table Pull on wire to verify secure connection AC Input Rectifiers per Feed 19 23 AWG max Strip Wire mm Torque In lb Nm AC1 Molex mini fit SR 2 Yes 8 n a AC3 IEC 320 C19 1 Yes...

Page 3: ... each equipped with 20 19 panel or 26 23 panel bullet style distribution positions Each position is selectable between Primary or Secondary Converter Voltage outputs Breaker sizes up to 250A TPS fuses to 70A and GMT fuses to 12A are available Lug Landings Distribution Battery Bus Landings 1 4 20 studs on 5 8 centers Lug tongue width 0 68 max 5 16 18 studs on 1 centers Torque 65 in lb 7 16 socket 1...

Page 4: ... pole breaker see illustration right Multi Pole Adapter Kits 2 required per breaker CC848756916 850021775 850021955 CC848756924 Poles 2 2 3 3 Lug Landings 1 4 x 5 8 3 8 x 1 3 8 x 1 3 8 x 1 Step 5 Set Controller alarm relay jumpers Pulsar Plus Set jumpers 1 thru 10 for the ten alarm relays as Close on Alarm or Open on Alarm Factory default setting is Open on Alarm ...

Page 5: ...ory of units To remove a rectifier converter A Open latch fully to release and remove B Enter Inventory section of controller and remove hardware to clear alarm 1 2 3 Step 8 Initial Startup Verify that all AC DC and Controller connections are complete and secure Turn on AC input breakers If there are no alarms make required adjustments to the default settings on the controller for this installatio...

Page 6: ... negative terminal connector hardware NOT under the connecting lug Temperature Measurement Temperature and Voltage Measurement Information Battery Monitoring Connections cables Temperature Measurement only Temperature and Voltage Measurement Order Codes Descriptions CC109142980 QS873A Thermal Probe 150026698 QS873B Ambient Thermal Probe CC848817024 B 10 controller to thermal probe wire set CC10915...

Page 7: ...C Power Minor C 13 W G BK R1 Battery On Discharge 4 BR W R1_C Battery On Discharge C BD_C 14 W W BK R2 Very Low Voltage VLV 5 S BK R2_C Very Low Voltage C VLV_C 15 W BK W R3 Fuse Alarm Major FAJ 6 BL BL W R3_C Fuse Alarm Major C FAJ_C 16 R BL R R4 AC Fail ACF 7 O O R R4_C AC Fail C ACF_C 17 R R R5 Rectifier Fail RFA 8 G G W R5_C Rectifier Fail C RFA_C 18 R R G R6 Mult Rectifier Fail MRFA 9 BR W R ...

Page 8: ...The display changes colors Green Normal Amber Minor Alarm Red Critical Major Alarm Some alarms may occur during initial installation e g thermal probe fail or Major Minor communication fail Clear these alarms Via Controller Display follow the menu path Menu Control Operation Clear Events or Uninstall Equipment Verify Basic Installation Settings Date Time Battery Type number of strings and float vo...

Page 9: ...connected to the LAN port using a standard ethernet cable Use a standard web browser to access the controller web pages at default IP address 192 168 2 1 Warning Do not connect LAN port to a network when set to Server mode Set the controller LAN port to Client or Static before connecting to the network Static is the factory default setting and the typical setting for most networks Once connected t...

Page 10: ...Z 150046488 48Vdc 24A Max 12Vdc 75A Information Rectifier Status LEDs Information Converter Status LEDs Specifications and Application Specifications and ordering information are in the Infinity S Ordering Guide available at www gecriticalpower com External Surge Protective Device SPD is required on all AC inputs Equipment and subassembly ports 1 are suitable for connection to intra building or un...

Page 11: ... system bonding network Precautions Install service and operate equipment only by professional skilled and qualified personnel who have the necessary knowledge and practical experience with electrical equipment and who understand the hazards that can arise when working on this type of equipment Disconnect batteries from outputs and or follow safety procedures while working on equipment Batteries m...

Page 12: ...Infinity S NE S Dual Voltage Power System Quick Start Guide 12 Document 8600243957P Rev 2 Jan 2019 GE Critical Power Notes ...

Reviews: