Infinity S (NE-S) Dual Voltage Power System
– Quick Start Guide
8
Document 8600243957P Rev 2 Jan 2019
GE
Critical Power
8
Information: Controller Basic Operation
View and change system parameters from the factory defaults via
A)
Controller Display
B)
Craft Port on front of controller using a laptop with EasyView2 software or HyperTerminal.
EasyView2 (GUI) software can be downloaded from
www.gecriticalpower.com
,
C)
J5 LAN port web pages using a laptop with browser. LAN port Server mode is for local laptop connection. Set the LAN
port to Server:
Controller Alarm Status:
The display changes colors; Green = Normal, Amber = Minor Alarm, Red = Critical/Major Alarm
Some alarms may occur during initial installation
; e.g.
thermal probe fail
or
Major/Minor communication fail .
Clear these alarms: Via Controller Display: follow the menu path;
Menu
>
Control/Operation
>
Clear Events
or
Uninstall Equipment
.
Verify Basic Installation Settings:
Date, Time, Battery Type, number of strings and float voltage
Menu
>
Configuration
>
System Settings
and
Menu
>
Configuration
>
Batteries
.
Front Panel
View and change system parameters from the factory defaults via the front panel:
Controller Front Panel Display and Controls
The main menu can be accessed using the Menu / Enter button
The basic menu structure for navigation is shown below:
Front Panel Menu Structure
–
Overview