8-3
Interlocks
Door interlocks is manageable on Innova 2000 depending on the country local regulation and X–Ray
system state.
No other measures employed for radiation protection should cause the interruption of radiation and
any other disturbance of a procedure in progress.
Refer to Chapter 6 – Section 3 – Room distribution.
9
EMERGENCY
An Innova 2000 System has to be powered by a second circuit coming from an emergency power
generator.
In this case, if the power is cut for about 20 seconds, the system reboot is long and requires about
5 minutes.
If a UPS feeds the system, it should be sized for 300 kVA (*) with an autonomy of 10 minutes
minimum, or more for further local contingency.
An interconnect diagram is defined as follows:
Hospital
main vault
UPS
300 kVA (*)
PDB
Innova 2000
System
(*) In cooperation with GE Digital Energy, a new UPS is under validation.
In all cases, contact your local GEMS representative for more information and/or public power
distribution analysis.
Note:
An UPS is inserted inside ACAB Cabinet and the DL is not affected by microcuts with a
duration less than 10
s.
ACAB UPS accepts a power cut without a hardware risk.
The UPS inserted inside ACAB Cabinet is a part of the system and it is not permitted to
replace it by another locally supplied unit.
UPS autonomy is 1 minute before shutdown
Delay before shut down is 1 minute without risk of loosing stored image.
Time to completely charge the battery of UPS is 48 hours.
10
MAC–LAB SYSTEM EX
The best location for a MAC–LAB Acquisition Unit Floor mount kit 408431–001 isn’t defined yet.
For MAC–LAB System EX, refer to:
Marquette document P/N 2000465–001 Preinstallation Guide.