continued
CABLE
FROM
TO
WIRE GAUGE
hospital
PDB
C1 Frontal Cabinet
35 mm²
AWG2
hospital
PDB
C1 Lateral Cabinet
35 mm²
AWG1
hospital
PDB
C2 Cabinet
6 mm²
AWG8
hospital
PDB
Fluoro UPS
10 mm²
AWG6
hospital
PDB
Fluoro UPS
10 mm²
AWG6
hospital
PDB
Frontal XRT Chiller
6 mm²
AWG10
hospital
PDB
Ground
35 mm² mini
AWG2/0 mini
hospital
PDB
Injector
AWG10
hospital
PDB
Lateral XRT Chiller
6 mm²
AWG10
hospital
Hospital mains
LDM UPS
AWG12
hospital
Hospital mains
LDM cabinet
AWG12
5.2.2 Power and Grounding Requirements
• A breaker with cut-out capability shall be installed by the customer (or his contractor) next to the PDB.
It is needed for the LOTO procedure in front of the PDB.
• The main facility ground conductor to the PDB shall be copper wire and the minimum size as required
by the local coding regulations, such as the NEC. For countries, which are not covered by local
requirement (like NEC), the ground wire to earth should be at minimum of AWG 2/0 (150 A breaker) UL
or 35mm
2
(80 A breaker) CE, or same size (100%) as feeder wires, whichever is larger.
• Power cables must not be used to supply other systems
• Cables shall be in conformity with local regulation (UL, CSA, IEC, CCC).
Table 5-5
Max Line Impedance for feeder line between Generator cabinet and Hospital
V
380
400
415
440
460
480
Ohms
0.09
0.096
0.101
0.108
0.114
0.12
NOTE
These 3 phases cables are not furnished by GE Healthcare. Provided by installer.
• These cables must be kept separated as much as possible from room system cables.
• The shield of any shielded cable coming from the distribution cannot replace the ground
wire.
Reference: For specific Vascular system grounding maps and connection details, refer to the MisMap and
mis chart listed in
5.3.1 MIS (Master Interconnect System) on page 156
.
Electrical Requirements
154
Innova
TM
IGS 6
5750182-1EN 3
Summary of Contents for Innova IGS 6
Page 9: ...Page intentionally left blank...
Page 57: ...Figure 2 11 Omega V Table dimensions Equipment Requirements 46 InnovaTM IGS 6 5750182 1EN 3...
Page 61: ...Figure 2 14 Gas box outlets Omega Table Equipment Requirements 50 InnovaTM IGS 6 5750182 1EN 3...
Page 69: ...Figure 2 22 C2 Cabinet dimensions Equipment Requirements 58 InnovaTM IGS 6 5750182 1EN 3...
Page 147: ...Page intentionally left blank Environmental Requirements 136 InnovaTM IGS 6 5750182 1EN 3...
Page 158: ...Figure 5 6 PDB Schematic CE 1 2 Electrical Requirements 5750182 1EN 3 InnovaTM IGS 6 147...
Page 159: ...Figure 5 7 PDB Schematic CE 2 2 Electrical Requirements 148 InnovaTM IGS 6 5750182 1EN 3...
Page 161: ...Figure 5 9 PDB Schematic UL 1 2 Electrical Requirements 150 InnovaTM IGS 6 5750182 1EN 3...
Page 194: ...InnovaTM IGS 6...