PACE Pressure Indicators User Manual
[EN] English
4 - 1
K0470 Revision A
4
Maintenance
4.1
Introduction
This section contains procedures for routine maintenance and the replacement of components
(Ref: Testing and Fault Finding, Section 5).
Table 4.1 - Maintenance Tasks
* may change depends on usage (e.g., rack mounted, bench top) and environment (e.g., humidity, dust).
† may change depends on the required accuracy.
4.2
Visual Inspection
Inspect for obvious signs of damage and dirt on the following:
a.
External of the instrument.
b.
Power supply adaptor
c.
Associated equipment.
Damaged parts must be replaced contact GE Service.
For cleaning (Ref: Cleaning Section 4.3).
4.3
Cleaning
CAUTION
Do not use solvents for cleaning.
Clean the front panel with a damp lint-free cloth and mild detergent.
4.4
Test
Do a standard serviceability test (Ref: Standard Serviceability Test, Section 5.2).
4.5
Calibration
The instrument should be returned to the manufacturer or calibration facility, (Ref: Section 6.14).
To find the date of the last calibration, press Measure set-up/Status/Calibration history.
Task
Period
Visual Inspection
Before use
Test
Before use
Cleaning
Weekly*
Calibration
12 months †
Summary of Contents for K0470
Page 9: ...K0470 Revision A viii EN English Intentionally blank ...
Page 30: ...PACE Pressure Indicators User Manual EN English 3 5 K0470 Revision A ...
Page 31: ...3 Operation K0470 Revision A 3 6 EN English ...
Page 41: ...4 Maintenance K0470 Revision A 4 2 EN English Intentionally blank ...
Page 78: ...www gemeasurement com ...