![background image](http://html.mh-extra.com/html/ge/logiq-e9/logiq-e9_service-manual_128639318.webp)
GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 34
Section 8-5 - Replacing Covers and Bumpers
8-5-4-1
Shear Wave Console Cover removal / installation
NOTE:
Whenever the left Side Cover is removed, clear the BEP Fan(s) intake(s) of any debris.
Table 8-9
Shear Wave Console Cover removal / installation
Steps
Corresponding Graphic
1.
Loosening the Top Cover or removing it will
allow the Front Cover to flex enough to
slide the Shear Wave Console Cover out.
Slide the Cover out.
2.
Re-install the replacemnt Cover.
3.
Re-install the Top Cover, if removed and the Side Cover.
4.
If the Top Cover was removed, perform Functional Checks. See:
,
8-5-5-5 "Functional Checks" on page 8-37
.
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......