GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 176
Section 8-6 - Replacing Top Console Parts
8-6-11
Gel Warmer replacement
8-6-11-1
Manpower
One person, 15 minutes.
8-6-11-2
Tools
8-2-5 "Tools needed for servicing the LOGIQ E9" on page 8-5
8-6-11-3
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the system.
2.) Disconnect the mains power cable from the wall outlet.
Follow this link if you need more information:
4-2-3 "Power shut down" on page 4-6
.
NOTICE
Energy Control and Power Lockout for LOGIQ E9
WHEN SERVICING PARTS OF THE SYSTEM WHERE THERE IS EXPOSURE TO VOLTAGE
GREATER THAN 30 VOLTS:
1. TURN OFF THE SCANNER.
2. UNPLUG THE SYSTEM.
3. MAINTAIN CONTROL OF THE SYSTEM POWER PLUG.
4. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE AS THERE ARE NO
TEST POINTS TO VERIFY ISOLATION. THE AMBER LIGHT ON THE OP PANEL ON/OFF BUTTON
WILL TURN OFF.
5. DISCONNECT THE EPS (EXTENDED POWER SHUTDOWN) BATTERY AT J3, OR THE
BATTERY FROM THE CHARGEBOARD AT PCN1 WHEN WORKING IN THE BEP. THIS SHOULD
BE DONE WHENEVER THE BEP IS OPEN AND THE EPS OR CHARGEBOARD IS EXPOSED AND
CHANGING PARTS.
Beware that the Main Power Supply, Extended Power Shutdown or ChargeBoard and BEP may be
energized even if the power is turned OFF if the cord is still plugged into the AC Outlet.
Signed
Date
TAG
&
LOCKOUT
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......