GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 10 Care & Maintenance
10 - 17
10-7-5
Chassis leakage current test
10-7-5-1
Definition
Also known as Enclosure Leakage current test, this test measures the current that would flow through
a grounded person who touches the accessible conductive parts of the equipment during normal and
fault conditions.
The test verifies the isolation of the power line from the chassis.The testing meter is connected to parts
of the equipment, easily contacted by the user or patient.
Measurements should be made under the test conditions specified in:
•
•
as applicable. Record the highest reading.
CAUTION
Electric Shock Hazard. When the meter's ground switch is OPEN, don't touch the Ultrasound
system!
CAUTION
Equipment damage possibility. Never switch the Polarity and the status of Neutral when the
Ultrasound system is powered ON. Be sure to turn the Ultrasound system power OFF before
switching them using the POLARITY switch and/or the NEUTRAL switch. Otherwise, the
Ultrasound system may be damaged.
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......