GE PROPRIETARY
TO
GE
D
IRECTION
5308917-100, R
EVISION
8
LOGIQ P3 S
ERVICE
M
ANUAL
8-56
Section 8-5 - USB Cable Set (FRU P/N: 5315039)
8-5-1
LV and Power distribution Board (Part No: 5315028) / Power distribution Board
Assembly (Part no: 5315104) - LOGIQ P3
8-5-1-1
Tools
•
Common Phillips screwdrivers
8-5-1-2
Needed Manpower
•
1person, 15 minutes
8-5-1-3
Preparations
Shutdown the system and switch off the main Circuit Breaker at the bottom rear side of the system
8-5-1-4
Removal Procedure
1) Loosen the Two screw (A) and pull out the Cables which are connected to PDB as shown in rectangle
box (B) in the
2) Remove LV & PDB assembly.Refer
Figure 8-63 Removing Hard Disk Drive Power cable
(B) Power cables
(A) Two Screws
(B) Power cable