Chapter 10 Care & Maintenance
10-7
Section 10-5
System Maintenance
10-5-1
Preliminary Checks
The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-6 System Checks
Step
Item
Description
1
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
2
Paperwork
Fill in the top of the Ultrasound Inspection Certificate (see
). Note all probes and system
options.
3
Power up
With AC input.
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
power up to verify that no warning or error messages are displayed.
4
Probes
Verify that the system properly recognizes all probes.
5
Displays
Verify proper display on the LCD.
6
Presets
Backup all customer presets on an DVD-RW.