GE PROPRIETARY
TO
GE
D
IRECTION
5308917-100, R
EVISION
8
LOGIQ P3 S
ERVICE
M
ANUAL
Chapter 2 Pre Installation
2-1
Chapter 2
Pre Installation
Section 2-1
Overview
2-1-1
Purpose of this chapter 2
This chapter provides the information required to plan and prepare for the installation of a LOGIQ P3.
Included are descriptions of the facility and electrical needs to be met by the purchaser of the unit.
2-1-2
Chapter Contents
Table 2-1 Contents in Chapter 2
Section
Description
Page Number