GE HealthCare CONFIDENTIAL
D
IRECTION
5936427
, R
EV
. 1
LOGIQ T
OTUS
Basic Service Manual
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline)
8 - 231
8-12-60
Replacement of the AC Inlet Fuse 2EA
8-12-61
Replacement of the UBE Board Set-T
Functional Check
Debrief Script
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
checks and is ready for use.
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-6 "Earth Leakage Current Test"
Functional Check
Debrief Script
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
checks and is ready for use.
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional
4-3-25 "Battery Pack functional checks"
4-3-26 "Battery Pack Extended functional checks"
(if the system has Battery Pack)
4-3-23 "4D option functional checks"
Summary of Contents for LOGIQ Totus
Page 2: ......
Page 4: ...GE HealthCare CONFIDENTIAL Direction 5936427 Rev 1 LOGIQ Totus Basic Service Manual ii...
Page 5: ...GE HealthCare CONFIDENTIAL Direction 5936427 Rev 1 LOGIQ Totus Basic Service Manual iii...
Page 6: ...GE HealthCare CONFIDENTIAL Direction 5936427 Rev 1 LOGIQ Totus Basic Service Manual iv...
Page 643: ......